Monday, July 19, 2010
Narrow escape!
Somebody was talking about making an interesting offer on The House, but I haven't heard anything for a few days. Whew! Bullet dodged!
Wednesday, June 16, 2010
Venice
Is it wrong to go to Venice and take pictures of the infrastructure? (Just kidding; I have lots of normal pictures, too.)
Monday, June 7, 2010
Housebuilding hiatus
"Oh, sure," you say, "You already went into hibernation once this year!" Well, Gentle Reader, this won't be hibernation; it'll be estivation. We're off to Budapest tomorrow for two months, and so there won't be any House work completed during that time.
Not to say I won't find something else interesting to post here (Europe does, after all, have the occasional attractive old building), but it won't be about progress on The House.
So I guess this would be a good time for a planning post, wouldn't it? Here's something like the current list:
- Windows in big house
- Finish painting first-floor windows
- Glazing work; several missing and cracked panes here and there, lots of putty replacement
- Winterization
- Carriage house
- Weatherstripping around two downstairs doors
- Insulated board for small window on south corner
- Still a little caulking/plastering above the south wall and in the closet area on the southeast corner
- Insulated board for attic access panel
- Big house
- Urethane in obvious holes in basement walls (mortar later)
- Boards over vents under first back addition
- Board up two basement windows on east basement
- Tuck pointing on both buildings
- Carriage house bathroom
- Attach and plumb vanity
- Carriage house electrical work
- Replace stolen ground wire outside
- Overhead light for washer/dryer area
- Separate circuit for bedroom to permit use of air conditioner
- Carriage house paint and trim
- Paint walls and trim in bathroom
- Finish trim on remaining windows (three)
- Fresh plaster patching and paint in living room, then hallway, stairs, and kitchen
- Equipment closet in big house
- Reroute incoming DSL into closet in dining room
- Add an electrical outlet there for the Linux box
- Carriage house garage area
- Remove superfluous fiberglass insulation (40% complete)
- Still some miscellaneous plaster, and more paint, aye!
- Dining room
- Remove and scrape wallpaper (60% done, thanks to daughter)
- Remove damaged drywall from ceiling
- Finish restoration of plaster on walls (base coat's on)
- Drywall ceiling
- Paint (I'm still liking that semi-gloss ultra white)
- Clean and maintain the woodwork and buffet
- Shore up under floor (soft spot from long-standing leak in roof fixed in 90's)
- Polish floor
- Carriage house kitchen window
- Carriage house roof and gutters (the last big money job to save for)
- Porch restoration
- Paint all pillars
- Cast duplicates of scroll work on pillars to replace missing bits
- Big house heat (not so crucial now)
- Ductwork as needed
- Probably baseboard heat upstairs, at least in my office
- Remainder of big house
- Upstairs bathroom plumbing (got a good plan to reroute this)
- Addition of sink in kitchen
- Cleaning
- Finish plaster patching in back stairs area, paint
- Reroute supply wire to blue room electrical (that's the one running outside right now)
- Think about plaster on basement walls, a big job
- It would be nice to insulate and finish the attic space
- Tiles in the master bath?
- Hardwood veneer in the Blue Room?
- Breezeway/swimming pool connecting buildings
- Well, I can dream
Friday, May 28, 2010
Plaster!
So now that I'm in the big house, I walk back and forth a lot between the front of the big house, down the back stairs and out the back door, into the carriage house and up those stairs to the apartment, which is still where the bathroom, kitchen, and remainder of the family is located. Not to mention, downstairs in the carriage house, the family room and my shop (actually just tool and materials storage, as I don't have a proper workbench).
I go through this door a lot, which is between the mudroom and the back stairs. It was originally the back door to the one-story back addition, probably originally the kitchen, and the "mudroom" is basically just a later back porch that has been enclosed - one wall still has the siding of the earlier back room, and the other wall is the brick of the earlier earlier back room. (This house tended to accrete back into further and further back rooms.)
Unfortunately, all the plaster around the door frame kind of fell off; the old box gutters were attached to the eyebrow that had a squirrel living in it last year (scroll down), and so there was obviously a great deal of leakage through the wall.
I go through this door a lot, which is between the mudroom and the back stairs. It was originally the back door to the one-story back addition, probably originally the kitchen, and the "mudroom" is basically just a later back porch that has been enclosed - one wall still has the siding of the earlier back room, and the other wall is the brick of the earlier earlier back room. (This house tended to accrete back into further and further back rooms.)Now, the problem with this door is that the frame had somehow managed to move to the east (that is, into the house) by about 3/4". The problem had obviously been of very long standing, because it had been caulked and some plaster added, clearly in an attempt at winterization. So naturally I popped the trim off, nailed a couple of 2x4 bits to it, and took the maul to it - which worked wonderfully! In about five minutes, I had it back where it was supposed to be!
Unfortunately, all the plaster around the door frame kind of fell off; the old box gutters were attached to the eyebrow that had a squirrel living in it last year (scroll down), and so there was obviously a great deal of leakage through the wall.So I took the opportunity to go to Menard's and make an exciting new purchase: a bag of base coat plaster!
Anybody who's been reading this blog for any length of time (a year already!) knows that I favor solid construction and masonry. The only problem is that I've never done any of it, so I'm learning as I go. This was therefore a gulpingly novel step. My first real plaster job.
Incidentally, the old basecoat plaster on this wall probably dates to about 1890 (the date I believe this back room was added, along with the dining room bay), and yes, it is mixed with what appears to be human hair for strength. Which I'd read about, and is only marginally creepy.
Lesson #1 about plaster: you need a lot of it. A base coat about half an inch thick over a couple of square feet of wall is a lot more plaster than my usual half-hour tuck pointing quantity of mortar. So this first bag of base coat is going to go fast.
But the first part of the base coat turned out extremely satisfactory in terms of solidity. Here's a picture. I'll update you when I try the top coat - right now I'm knocking out all the crappy bits of plaster on the back stairs and putting a base coat into those (rather extensive) gaps.
Tuesday, May 18, 2010
I'm in the big house
A hueueuege milestone, one year and two days after my arrival - I moved my office into the upstairs front room of the big house.

In case you're wondering, that dot on the wall between these two windows appears to be the fitting for the original gas light. I mean, I can't be sure, of course; I can't find the pipe where it starts, but that's my assumption. If true, it's the only such fitting I've found in the house.
Sunday, May 16, 2010
One room spiffy and clean
One room nearly done (the carriage house bedroom). First picture is the picture my sister took the day we closed; the second is the one I took just now after lots of paint was applied, the new window is trimmed and painted, and a new light fixture is in place. I guess you see the baseboard heater as well. (The door is still stripped here and needs a new knob, but it's always exciting to paint things and the room won't be this empty again any time soon.)

Friday, May 14, 2010
Subscribe to:
Posts (Atom)