Not to say I won't find something else interesting to post here (Europe does, after all, have the occasional attractive old building), but it won't be about progress on The House.
So I guess this would be a good time for a planning post, wouldn't it? Here's something like the current list:
- Windows in big house
- Finish painting first-floor windows
- Glazing work; several missing and cracked panes here and there, lots of putty replacement
- Winterization
- Carriage house
- Weatherstripping around two downstairs doors
- Insulated board for small window on south corner
- Still a little caulking/plastering above the south wall and in the closet area on the southeast corner
- Insulated board for attic access panel
- Big house
- Urethane in obvious holes in basement walls (mortar later)
- Boards over vents under first back addition
- Board up two basement windows on east basement
- Tuck pointing on both buildings
- Carriage house bathroom
- Attach and plumb vanity
- Carriage house electrical work
- Replace stolen ground wire outside
- Overhead light for washer/dryer area
- Separate circuit for bedroom to permit use of air conditioner
- Carriage house paint and trim
- Paint walls and trim in bathroom
- Finish trim on remaining windows (three)
- Fresh plaster patching and paint in living room, then hallway, stairs, and kitchen
- Equipment closet in big house
- Reroute incoming DSL into closet in dining room
- Add an electrical outlet there for the Linux box
- Carriage house garage area
- Remove superfluous fiberglass insulation (40% complete)
- Still some miscellaneous plaster, and more paint, aye!
- Dining room
- Remove and scrape wallpaper (60% done, thanks to daughter)
- Remove damaged drywall from ceiling
- Finish restoration of plaster on walls (base coat's on)
- Drywall ceiling
- Paint (I'm still liking that semi-gloss ultra white)
- Clean and maintain the woodwork and buffet
- Shore up under floor (soft spot from long-standing leak in roof fixed in 90's)
- Polish floor
- Carriage house kitchen window
- Carriage house roof and gutters (the last big money job to save for)
- Porch restoration
- Paint all pillars
- Cast duplicates of scroll work on pillars to replace missing bits
- Big house heat (not so crucial now)
- Ductwork as needed
- Probably baseboard heat upstairs, at least in my office
- Remainder of big house
- Upstairs bathroom plumbing (got a good plan to reroute this)
- Addition of sink in kitchen
- Cleaning
- Finish plaster patching in back stairs area, paint
- Reroute supply wire to blue room electrical (that's the one running outside right now)
- Think about plaster on basement walls, a big job
- It would be nice to insulate and finish the attic space
- Tiles in the master bath?
- Hardwood veneer in the Blue Room?
- Breezeway/swimming pool connecting buildings
- Well, I can dream
You're going to Hungary to dry out?
ReplyDeleteHa! No, gotta keep the kids bilingual.
ReplyDelete