I've been looking into plaster lately. It's not all that easy to find plaster, for sale I mean. But I want to learn how to do it right. There is a store for plaster-specific supplies about an hour and a half from here. I'm thinking of visiting soon. For instance, there's a nifty material called "plaster bond" that you can put into cracks before refinishing. The carriage house has lots of cracked plaster (the big house, not so much, for some reason). I'm eager to give this stuff a try.
Wednesday, November 4, 2009
Southwest corner update
Monday, November 2, 2009
In the dining room by Thanksgiving, afterthought
So who's coming? Potluck makes sense, don't you think?
Sunday, November 1, 2009
In the dining room by Thanksgiving
So we've come up with the goal of making this one room usable by Thanksgiving, and having a good-sized meal there. A collateral goal will be the installation of a sink in the kitchen, which is the room to the west of the dining room which was last used as a kitchen in the big house (it was a bedroom for 304 in the 70's and 80's, and it is currently my sawing shop, because the generation of sawdust in the carriage house has been denied approval by the household environmental management commission, a body whose membership comprises my wife).
So anyway, I guess I haven't posted a to-do list recently!
- Carriage house livability
- Garage area livability
- Remove superfluous fiberglass insulation (40% complete)
- Caulk everywhere (a lot is done; more to be done)
- Some plaster patching (done on southwest, need to move everything out off the east wall to continue the process)
- More paint, aye!
- Seriously considering laying down a heating pad and hardwood veneer on the south end of the downstairs; the white walls certainly make the area look like a place you could live in
- Windows
- Kitchen window is the only one left
- Bathroom
- Attach and plumb vanity
- Carriage house electrical work
- Replace stolen ground wire outside
- Entryway lighting
- Overhead light for washer/dryer area
- Separate circuit for bedroom to permit use of air conditioner
- Carriage house paint and trim
- Paint walls and trim in bathroom
- All window trim
- Dining room (target: Thanksgiving. Yes, 2009, pipe down over there.)
- Remove and scrape wallpaper (30% done, thanks to daughter)
- Remove all damaged plaster on walls
- Remove damaged drywall from ceiling
- Restore plaster on walls
- Drywall ceiling
- Paint (I'm still liking that semi-gloss ultra white)
- Clean and maintain the woodwork and buffet
- Shore up under floor (soft spot from long-standing leak in roof fixed in 90's)
- Polish floor
- Remainder of big house
- Upstairs bathroom plumbing
- Addition of sink in kitchen
- Cleaning
- Winterization, a lengthy process
- Heat
- Electrical systems: oh the humanity!
Monday, October 26, 2009
Drywall!
Two days ago, I finished that. It's not sanded or painted yet, but it's not fiberglass hanging out, either. After cleaning out the ants, I replaced the insulation, and then it was time to start.
This is the first time I've used full sheets of this mold-resistant cementitious wallboard. It's heavy, way heavier than conventional drywall. Still much lighter than a wall made of bricks, of course. In comparison with the rest of the building, this wall feels distinctly flimsy.
I'm using "Ultra White" latex paint for these walls. I like white, a lot - and I have to say, I'm really liking how it looks in this basement area.
Sunday, October 25, 2009
Concrete is our friend
The floor of that southwest corner was pretty grotty - but when I really got in there with the Shopvac and sucked out all the loose dirt and brick dust and humus, it turned out to be a honking huge hole about four inches deep. The original plan was to patch it up with patching cement, but that stuff just isn't made for large volumes, and besides I just had a 10-pound bag, which would probably just disappear into that hole and never be seen again.
Bigger guns were necessary, in this case (gulp) actual concrete, which I had never actually used before.
Well, flush with that success - remember back on July 26, when I finished the washer/dryer hookup and right at the end of the post I mentioned there was a truly big hole right in that corner where somebody once obviously fixed the drain stack but found refilling the hole just too much trouble?
It was a weird feeling, bringing load after load of dirt into the house, with a wheelbarrow, and it felt like a crime to use this lovely dirt to fill in a hole in the basement, but we got lots of this dirt out there, so there you go.
The next step was pea gravel, for a nice solid base after tamping down the dirt with a short length of 2x4 for a while. This part was much easier; no wheelbarrow was harmed in the taking of this picture.
Then it was on to the concrete itself. We finished off the first bag, then carried the other in from the car (I carried, she made sure the dog didn't get out).
We still ran out of concrete before we ran out of hole; this is the second bag of concrete. Turned out to be a bigger hole than I thought.
So we went out for Mexican (I had the burrito/taco/rice/beans combo, which was on special and quite good), and bought three more bags of concrete, each of which I now feel in every muscle of my body, and it took another bag and a half!
So we went out for Mexican (I had the burrito/taco/rice/beans combo, which was on special and quite good), and bought three more bags of concrete, each of which I now feel in every muscle of my body, and it took another bag and a half!
But the lovely result is what will soon be a solid floor for the washer and dryer:
Saturday, October 24, 2009
Southeast side drainage complete
So back on July 25 I posted about the drainage ditch I dug on the south side of the east end of the basement; sometime in August or September, I dug the ditch out better and buried some 4-inch corrugated PVC pipe in it along with many bags of pea gravel. For some reason I can't find pictures, so I don't have an exact date (I suppose my Menard's receipts would tell me, if I'd kept up that database, but I didn't, so they stand mute).
At any rate, Thursday I finished said ditch, after rain threatened (thereby causing my wife to threaten). The fear was that the rain would come and stay until the entire pile of dirt froze in place for the winter, which would suck.
Here's the front of the wall, showing the hole at the bottom. It's about two inches high and six wide. Well, once I got things to this point, I realized that this was already a large enough opening for a drain, so I tamped the dirt down and put a large flat limestone rock on the bottom to prevent erosion out of the hole, then I thought: dammit, Jim, I'm a bricklayer now.
So I went and mixed up some mortar, and built a little brick structure to hold the pipe in place; the light was starting to fail a little, and the rain had started, so this picture is blurry, and the last in the series out at the ditch; after this was built and I'd slopped mortar all over it, and next to the floor of my drainage outlet, I dumped in ten pounds of pea gravel and buried the whole thing.
Well, but then I had some mortar left over, so I used it up on some experimental tuck pointing on the carriage house, and mortaring up the seam between the wall and the entry door.
I'd been putting it off because the ditch would have to terminate at the retaining wall on the sidewalk, and the logical next step would be to punch through that wall with a clay pipe - but nobody sells clay tile pipe any more. But Thursday was the day. Above, you see my crowbar inserted into the aforementioned wall. Amazingly, I was able to lever a couple of stones out of the bottom of the wall.
Here's a picture taken the following morning - see if you can tell which joints are tuck pointed. This little bit of work represents maybe half an hour. I'm getting much better at it (it took me most of the day to do the bricks under the window, remember?) but it's still time-consuming work.
Worth it, though. I'm really starting to love masonry.
Saturday, October 17, 2009
Carriage house door
Irritating. And cold! So my wife mandated that this was to be the task today, and so mote it be.
So all I did was to remount the hinges with reasonable screws, using a trick I learned from my uncle: coat a toothpick with Elmer's glue, and stick it into the stripped hole before inserting the screw. Works a charm.
The bottom of the frame was also loose for lack of support, so I put a brick under either end of the threshold and drove in some shims to force it up against the frame, and thus the frame up against the bricks above it. Much solider now (oh shims, is there anything you can't improve?)
Once the door was rehung, it turned out that the strike plate was in the wrong place (it was right for a modern doorknob, but this door has antique knobs, so the strike plate needs to be about a quarter inch further into the frame). So I moved it, and adjusted the strike plate for the deadbolt.
This is the kind of thing that makes me feel successful in this endeavor.