Wednesday, November 4, 2009

Southwest corner update

Well, it's not done yet, but progress is definitely being made. I'm pretty happy with how this is coming out.

I've been looking into plaster lately. It's not all that easy to find plaster, for sale I mean. But I want to learn how to do it right. There is a store for plaster-specific supplies about an hour and a half from here. I'm thinking of visiting soon. For instance, there's a nifty material called "plaster bond" that you can put into cracks before refinishing. The carriage house has lots of cracked plaster (the big house, not so much, for some reason). I'm eager to give this stuff a try.

Monday, November 2, 2009

In the dining room by Thanksgiving, afterthought

So who's coming? Potluck makes sense, don't you think?

Sunday, November 1, 2009

In the dining room by Thanksgiving

Here is the original picture of the dining room from this May; things haven't really changed much since then; the focus has, of course, been carriage house livability. As you'll recall, one driver for the roof project was leaks above this room; there is some damage to the late-period drywall on the ceiling and the wallpaper was basically a loss, as you can see even in this picture.

But it's a fantastic room; all the woodwork looks like this, very little of the molding is missing, and the floor, while chopped up a lot from the room's use as the kitchen of the apartment in 304 during the 70's and 80's, is still attractive.

So we've come up with the goal of making this one room usable by Thanksgiving, and having a good-sized meal there. A collateral goal will be the installation of a sink in the kitchen, which is the room to the west of the dining room which was last used as a kitchen in the big house (it was a bedroom for 304 in the 70's and 80's, and it is currently my sawing shop, because the generation of sawdust in the carriage house has been denied approval by the household environmental management commission, a body whose membership comprises my wife).

This picture, taken in August while the roof was off (hence the bit of light showing at the top of the wall) shows what we're going to have to fix up in terms of the ceiling. Actually, it doesn't show the worst of it, which is just off the top of the picture - that entire sheet of drywall there is rotten and moldy around the edge, reportedly due to an overflow in the bathtub upstairs. Which I take to mean repeated and egregious overflow; a single incident would not account for the damage I see.

So anyway, I guess I haven't posted a to-do list recently!
  1. Carriage house livability

    • Garage area livability
      • Remove superfluous fiberglass insulation (40% complete)
      • Caulk everywhere (a lot is done; more to be done)
      • Some plaster patching (done on southwest, need to move everything out off the east wall to continue the process)
      • More paint, aye!
      • Seriously considering laying down a heating pad and hardwood veneer on the south end of the downstairs; the white walls certainly make the area look like a place you could live in

    • Windows
      • Kitchen window is the only one left

    • Bathroom
      • Attach and plumb vanity

  2. Carriage house electrical work
    • Replace stolen ground wire outside
    • Entryway lighting
    • Overhead light for washer/dryer area
    • Separate circuit for bedroom to permit use of air conditioner

  3. Carriage house paint and trim
    • Paint walls and trim in bathroom
    • All window trim

  4. Dining room (target: Thanksgiving. Yes, 2009, pipe down over there.)

    • Remove and scrape wallpaper (30% done, thanks to daughter)
    • Remove all damaged plaster on walls
    • Remove damaged drywall from ceiling
    • Restore plaster on walls
    • Drywall ceiling
    • Paint (I'm still liking that semi-gloss ultra white)
    • Clean and maintain the woodwork and buffet
    • Shore up under floor (soft spot from long-standing leak in roof fixed in 90's)
    • Polish floor

  5. Remainder of big house

    • Upstairs bathroom plumbing
    • Addition of sink in kitchen
    • Cleaning
    • Winterization, a lengthy process
    • Heat
    • Electrical systems: oh the humanity!

Monday, October 26, 2009

Drywall!

Back on October 5 when I started the southwest corner, the initial picture showed that the south wall fill-in where the garage door used to be had no drywall. (That's where the ants were on October 13.)

Two days ago, I finished that. It's not sanded or painted yet, but it's not fiberglass hanging out, either. After cleaning out the ants, I replaced the insulation, and then it was time to start.

The first sheet took way too long. I'd measured the height of the sheet at the front of the frame on top of the opening, but nothing in this opening is even close to square. So I ended up cutting off another half inch or so, a little bit at a time. Ugh. But finally it was in place.

This is the first time I've used full sheets of this mold-resistant cementitious wallboard. It's heavy, way heavier than conventional drywall. Still much lighter than a wall made of bricks, of course. In comparison with the rest of the building, this wall feels distinctly flimsy.


For the second sheet, I measured the height of the first sheet, determined not to make the same mistake. So naturally, this sheet was an inch too short on the left side. Oy. It didn't even come up to the 2x4 frame-in. The answer: lots of spackle, oh well.

The wall as she looks today - I spackled in around all the edges, and the result is pretty darned nice. My next trick is to sand all the spackle and paint it, along with the frame of the old garage door.

I'm using "Ultra White" latex paint for these walls. I like white, a lot - and I have to say, I'm really liking how it looks in this basement area.

Sunday, October 25, 2009

Concrete is our friend

The floor of that southwest corner was pretty grotty - but when I really got in there with the Shopvac and sucked out all the loose dirt and brick dust and humus, it turned out to be a honking huge hole about four inches deep. The original plan was to patch it up with patching cement, but that stuff just isn't made for large volumes, and besides I just had a 10-pound bag, which would probably just disappear into that hole and never be seen again.

Bigger guns were necessary, in this case (gulp) actual concrete, which I had never actually used before.

So today my daughter and I learned how to work with concrete - turns out it's just like mortar except with gravel instead of sand, and probably some other differences. The important thing is, just like mortar, if you mix it with enough water and you're patient, it is a very forgiving medium. Here's the corner after we lugged in an 80-pound back of Quikrete from the car (good God 80 pounds is heavy) and mixed it up a bucket at a time, troweling it into place with our mortar trowels (which worked fine).

Then, what the heck, we kept right on going along the west wall, which had a lot of weirdness in it, including the bottom of the white window featured last week or so, pictured here. I had been wondering how best to seal up the base of that door fill-in; as always, masonry is totally our friend.

Well, flush with that success - remember back on July 26, when I finished the washer/dryer hookup and right at the end of the post I mentioned there was a truly big hole right in that corner where somebody once obviously fixed the drain stack but found refilling the hole just too much trouble?

Well, they were right. It was a job of work, let me tell you. First, we wheelbarrowed in six loads of dirt; two left over from the drainage ditch, and four from next to the cold frame where there's kind of a little hill built up.

It was a weird feeling, bringing load after load of dirt into the house, with a wheelbarrow, and it felt like a crime to use this lovely dirt to fill in a hole in the basement, but we got lots of this dirt out there, so there you go.

The next step was pea gravel, for a nice solid base after tamping down the dirt with a short length of 2x4 for a while. This part was much easier; no wheelbarrow was harmed in the taking of this picture.

Then it was on to the concrete itself. We finished off the first bag, then carried the other in from the car (I carried, she made sure the dog didn't get out).

We still ran out of concrete before we ran out of hole; this is the second bag of concrete. Turned out to be a bigger hole than I thought.

So we went out for Mexican (I had the burrito/taco/rice/beans combo, which was on special and quite good), and bought three more bags of concrete, each of which I now feel in every muscle of my body, and it took another bag and a half!

But the lovely result is what will soon be a solid floor for the washer and dryer:

Saturday, October 24, 2009

Southeast side drainage complete

So back on July 25 I posted about the drainage ditch I dug on the south side of the east end of the basement; sometime in August or September, I dug the ditch out better and buried some 4-inch corrugated PVC pipe in it along with many bags of pea gravel. For some reason I can't find pictures, so I don't have an exact date (I suppose my Menard's receipts would tell me, if I'd kept up that database, but I didn't, so they stand mute).

At any rate, Thursday I finished said ditch, after rain threatened (thereby causing my wife to threaten). The fear was that the rain would come and stay until the entire pile of dirt froze in place for the winter, which would suck.

I'd been putting it off because the ditch would have to terminate at the retaining wall on the sidewalk, and the logical next step would be to punch through that wall with a clay pipe - but nobody sells clay tile pipe any more. But Thursday was the day. Above, you see my crowbar inserted into the aforementioned wall. Amazingly, I was able to lever a couple of stones out of the bottom of the wall.

Here's the front of the wall, showing the hole at the bottom. It's about two inches high and six wide. Well, once I got things to this point, I realized that this was already a large enough opening for a drain, so I tamped the dirt down and put a large flat limestone rock on the bottom to prevent erosion out of the hole, then I thought: dammit, Jim, I'm a bricklayer now.

So I went and mixed up some mortar, and built a little brick structure to hold the pipe in place; the light was starting to fail a little, and the rain had started, so this picture is blurry, and the last in the series out at the ditch; after this was built and I'd slopped mortar all over it, and next to the floor of my drainage outlet, I dumped in ten pounds of pea gravel and buried the whole thing.

Well, but then I had some mortar left over, so I used it up on some experimental tuck pointing on the carriage house, and mortaring up the seam between the wall and the entry door.

Here's a picture taken the following morning - see if you can tell which joints are tuck pointed. This little bit of work represents maybe half an hour. I'm getting much better at it (it took me most of the day to do the bricks under the window, remember?) but it's still time-consuming work.

Worth it, though. I'm really starting to love masonry.

Saturday, October 17, 2009

Carriage house door

The "front door" to the carriage house apartment is actually on the east side of the building, directly opposite the door into the "above-ground basement". As you can see, when closed, it shows a lot of daylight at the bottom and lower left. Moreover, it doesn't close well (or didn't), having to be lifted into place, effectively, and the deadbolt could only be locked or unlocked while pulling in and up on the door, making it impossible to get into the carriage house while carrying anything.

Irritating. And cold! So my wife mandated that this was to be the task today, and so mote it be.

Before weatherizing the door, though, I first had to rehang it so it would actually close correctly. The culprit in this case was the top hinge, pictured here. Oy. My guess is this hinge was damaged by a tenant trying to gain access after losing a key, and the "obvious" way to fix the hinge was to use longer screws, and drive them in with a drill, thus tearing hell out of the heads. Note the attempt to angle the screws, because the wood under the hinge is splintered.
So we take off the door, and the inside trim; wow! The frame is really not very thick! And shows the imprints of lots of historical hinges; my guess is this frame is original. Certainly it's older than you or me, anyway, and as we can see, there is a lot of open space behind it. Also a lot of dirt; really, to clean a house thoroughly, it has to be disassembled first.

Note, incidentally, the view of the sunroom of the big house in the background. Just to orient you here.

Anyway, here's why these screws didn't hold the door up; the threads are mostly not in the wood. The screw was long enough to extend into the bricks behind it, but probably not long enough there to get sufficient purchase, and the outer two screws are just hitting the plaster anyway. Useless.

So all I did was to remount the hinges with reasonable screws, using a trick I learned from my uncle: coat a toothpick with Elmer's glue, and stick it into the stripped hole before inserting the screw. Works a charm.

The bottom of the frame was also loose for lack of support, so I put a brick under either end of the threshold and drove in some shims to force it up against the frame, and thus the frame up against the bricks above it. Much solider now (oh shims, is there anything you can't improve?)

Once the door was rehung, it turned out that the strike plate was in the wrong place (it was right for a modern doorknob, but this door has antique knobs, so the strike plate needs to be about a quarter inch further into the frame). So I moved it, and adjusted the strike plate for the deadbolt.

As a result, amazingly, the door is now square to the floor. Wow. It's actually a pretty good door, although clearly it needs some paint. As you see, after I removed the threshold, there's actually a lot more gaping space there (a problem to be resolved tomorrow) - but instead of closing laboriously with a squeak-BLAM, it can now be pushed closed with one finger, and stays closed, and you can unlock the deadbolt even with your groceries and the umbrella in your other hand.

This is the kind of thing that makes me feel successful in this endeavor.