Nope, they're not carpenter ants, just bog-standard large-issue black ants whose anthill happens to be in a place that stays miraculously warm through the winter. I feel almost apologetic kicking them out.
Tuesday, October 13, 2009
Ants!
Sunday, October 11, 2009
More on that southwest corner
Above the window, the plaster had come loose from the wall, but was still relatively solid, so I used my adhesive caulk to glue it back to the wall. Not a technique that I would recommend for a wall that is intended to be smooth at the end of the process, but for my purposes, a nice white wall that gives some indication of its history, it's probably ideal.
I'll sand all this plaster tomorrow and see where it needs more fill. Also tomorrow, I hope, will be drywall on the frame section of the south wall (where the garage door used to be). Above the dark beam (that supported a rail for the garage door) the plaster is in seriously bad condition, again having disengaged from the wall and cracked. I'm not yet sure how I'll handle that. Probably more caulk and plaster patch; it's working very well elsewhere.
This corner is going to look great.
Beautification II: before and after
Now, on the south wall of this area, there's a large patch where missing plaster had been replaced by mortar. I was impressed, never having considered mortar in this application. But it works! It's ugly, but rock-hard.
So I mixed up some mortar and stuffed the holes, then the next day I cleaned out the mortar and did it again, because had I screwed up the first batch; it had become friable and sandy and could be flicked out by hand. I hadn't put enough water into the mixture, so on my second trial I was very careful: I mixed a much goopier starting mixture, carefully sprayed water onto the brick in the hole, then applied the mortar. To be extra-careful, I sprayed water onto the mortar again that evening - the longer mortar takes to dry, the better it cures (the crystallization process stops when the mortar dries, you see).
Once I was satisfied that my second batch of mortar was going to set properly, I used plaster patch to smooth it out somewhat. It would have been a waste of time to make it too smooth, as the rest of this wall is anything but - so I just slapped some plaster onto it and painted it.
Once you gain a little physical skill working with mortar and masonry, I have to say, it is a very forgiving medium. I'm really starting to like it a lot.
Thursday, October 8, 2009
Cory Doctorow's "Someone Comes to Town, Someone Leaves Town"
I ran across a mention of one of Cory Doctorow's books that I had never really noticed before (Someone Comes to Town, Someone Leaves Town), and the first chapter (at least) is about house renovation. Amazing. Cory gets it.
Tuesday, October 6, 2009
Monday, October 5, 2009
Beautification target: carriage house "basement" southwest corner
Big enough, in fact, that my first step was just to cut up a bunch of leftover Styrofoam (from the box from the overhead light, actually) and jam them in.
I'll post more on this endeavor later.
Friday, October 2, 2009
Roof complete
So we put it back.

The north side of the house looks even cooler, I think. These eaves hang pretty far out, and the contractor was pretty frustrated that I wanted them wrapped in metal instead of vinyl. (The width made the metal hard to handle without it buckling.) But there's no other plastic in this house, and I don't intend to be the one to start.
The north side of the house looks even cooler, I think. These eaves hang pretty far out, and the contractor was pretty frustrated that I wanted them wrapped in metal instead of vinyl. (The width made the metal hard to handle without it buckling.) But there's no other plastic in this house, and I don't intend to be the one to start.
I'm thinking some horizontal boards similar to the ones on the eaves on the sunroom (the very top right of the first picture up there) might look nice, and tie the whole thing together visually. Opinions?
So given my recent strides in electrical work in the carriage house, here's my rough to-do list:
- Carriage house livability
- Garage area livability
- Remove superfluous fiberglass insulation from the ceiling and around heating ducts (we're going to heat the garage area, after all; we're living in it)
- Drywall the south wall where the garage door used to be
- Caulk everywhere (a lot is done; more to be done)
- Some plaster patching
- More paint, aye
- Windows
- Finish bathroom window
- Kitchen window
- Bathroom
- Attach and plumb vanity
- Carriage house electrical work
- Replace stolen ground wire outside
- Entryway lighting
- Overhead light for washer/dryer area
- Separate circuit for bedroom to permit use of air conditioner
- Carriage house paint and trim
- Paint walls and trim in bathroom
- All window trim
- Big house
- Upstairs bathroom plumbing
- Cleaning
- Winterization, a lengthy process
- Heat
- Electrical systems: oh the humanity!
Subscribe to:
Posts (Atom)