"Our underwriting guidelines currently do not allow us to insure properties whose replacement values are significantly higher than their market value. Sorry for the inconvience."
And I didn't even tell them about the carriage house!
Which makes me wonder: just how much would it cost to replace this house? The mind boggles! Millions, I'm sure.
They have a couple of (not so beautiful) houses in the neighborhood slated for demolition. I'm hoping I might be able to snag some floorboards if I figure out who to ask.
Monday, September 14, 2009
Saturday, September 12, 2009
Then (1905) and Now (2009)
Specifically, summer of 1905 or thereabouts (the pictorial history was published in 1906, reprinted in 1991 by the local historical society, and the photography was taken for the edition, so we're talking the previous summer, I figure).
Here's a shot as close to that as I can make it. Notice the back porch where today's sunroom should be (which matches the historical plans I've found so far) and the fact that the carriage house had already been built (which contradicts the tax records). I had been assuming 1909 for the carriage house, but it looks as though they'd already built it by 1905.
The porch and trim were brown! I don't care for that myself; I prefer the white they show today. There's no railing on the front stairs, and no wall around the yard, and their gardener was clearly better than mine.
But what really amazes is that the house is basically identical, but today's massive sycamores had not yet been planted. Wow.
Friday, September 11, 2009
Second-story frame roof
As of today, by the way, my house has a fully non-leaking roof.
See that hole in the roof? There was a flue there.
So that was today's progress. The roof is closed up now, with tar paper on it. Shingles go on Monday. Over the weekend, I'll continue work on the baseboard heat. There are four more heaters to install, and three wall thermostats. Textbook electrical work.
Baseboard heat #1
On the other hand, it made it way easier to get that wire down into the downstairs area. (We've been calling it the basement although it's above ground. Sort of a well-lit basement. It feels like a basement. It's not a garage, because it has no garage door. Must be an above-ground basement.)
I answered my question with this: "How do you attach things to a brick wall?" Answer: nail it or screw it. I used drywall screws; they just zoop right in and hold fast. (Well, I twisted the head off one.) It was pretty impressive, and that heater is well-attached.
Tuesday, September 8, 2009
Bathroom window
Peel Stop is kind of cool stuff. It smells just like Elmer's Glue, and it soaks into peeling substrate and binds it. They do warn (duh) that this is no substitute for proper surface preparation, and I'm sure this is true, but since proper surface prep in this case would be replacement of the sill plate - a project I can't afford to repeat this fall - this approach will have to do. Ask me again in a year or two how important that surface preparation was.
Note that there are three levels of sill plate. The outer one is rotten on top, but the rot has eaten into the gap between the outer plate and the middle one that is probably the sill plate proper - by "eaten in" I mean there wasn't shelf fungus on it yet, but there was white mold with hyphae, and it had eaten a spongy cave about an inch into the wood under there. I filled it with urethane foam (yes, it is Great Stuff), cut it roughly flush, and painted over the entire thing.
This picture also shows the roof of the outhouse. I might reshingle it, just to match, but since this is the only roof on the property I don't really care about, its priority is rather low. A bit of paint on the trim wouldn't hurt, though. Perhaps this will be an October project, weather permitting.
Anyway, I'll post a finished picture of the bathroom window after installation; right now, the final coat of paint is drying.
Monday, September 7, 2009
Front windows
These windows, what with the need to rebuild the sill and reset the bricks under the old sill plate, really set me back longer than I had wanted. I wanted to have the heat under control during the month of August. But life does these things to us.
The current plan would have to be this:
- Carriage house electrical work
- Replace stolen ground wire outside
- Baseboard heaters
- Entryway lighting
- Second switch for garage area overhead lighting
- Troubleshoot outlets in kitchen (none work)
- Overhead light for washer/dryer area
- Separate circuit for bedroom to permit use of air conditioner
- Carriage house livability
- Garage area livability
- Remove superfluous fiberglass insulation from the ceiling and around heating ducts (we're going to heat the garage area, after all; we're living in it)
- Drywall the south wall where the garage door used to be
- Caulk everywhere (a lot is done; more to be done)
- Some plaster patching
- More paint, aye
- Bathroom
- Attach and plumb vanity
- Touch up paint on walls and paint the trim
- Windows
- Finish bathroom window
- Kitchen window
- Interior trim on all windows
- Big house
- Roof work proceeding apace
- Upstairs bathroom plumbing
- Cleaning
- Winterization, a lengthy process
- Heat
- Electrical systems: oh the humanity!
Dining room roof Before

Boy, posting has gotten sparse, hasn't it? Sorry about that (especially to you, Mystery Seventh Follower). But it was all up to technical problems - specifically, I'd taken the Before pictures of the dining room roof with my daughter's camera, and we couldn't find the cable. Today, I found the cable! So here's the before on the dining room roof.
I've uploaded this at 1MB, twice the resolution I've been stingily using here on The House, because there's a lot of information in this picture. (Click it for the big version.) But the upshot is: this roof on the embayment on the north side was raining through the ceiling to a serious extent, and it's the first work I've paid to have done on The House. So it's a landmark decision.
The roof was covered in tar, over shingles, over tin (sigh), and the box gutters were rotted, as is the general case throughout the building. On the left point where the box gutter is flush to the brick, you can see a gray line running upwards, then to the right. That, my friends, is a live power wire, which leads out the basement window, over the dining room, and through the brick wall into the bathroom of the blue room. !! No, this is not compliant with code anywhere except possibly in Nigeria. It is dangerous. I'm pretty sure that's the power to the Blue Room, though. I don't know yet. Wiring will therefore be figuring in my life in the upcoming months.
This picture also shows the interesting vertical crack down from the second-story bathroom window (the leaded window in the upper left). That was obviously another full-sized window, probably another bedroom, that was bricked in with a smaller window when the bathtub was put in. It - like the rest of the house - is crying out for tuck pointing.
I have bought a grout bag (a $5.26 investment at Lowe's) for said tuck pointing. Way easier, I'm told, than troweling it all in. I'll update you on that when I get started.
Here's a view from the top of the left-hand end of the box gutter. Sigh. I can only feel good about the fact that all this is historical now; it's already history. But this nice little hole is responsible for a three-foot-wide strip of moldering plaster and sagging wallpaper in the dining room below it. Also, if you're into flashing, you can cringe with me looking at the upper right of this photo. If you've never considered how roofs are supposed to interface with brick, please have my assurances that this is not it.
Flabbergastingly, the underlying structure of this roof was sound. It was all original timber, dating to about 1910 when they built the embayment and presumably put in the buffet and the woodwork. We had to replace some of the 1x planks in the roof and shore up two rafters that had suffered water damage, but otherwise, this roof just got a new surface. At the edge, we replaced the old box gutter with an angled affair which I'll show you later (that camera is in the car, and not here right now). Turns out that the brick goes right up to the top corner on the roof, so we couldn't substantially change its shape.
Anyway, more later. I've nearly finished the bathroom window, and the current top item is baseboard heating (I've bought the heaters and gotten the permit - halfway done! Ha!) But as it is Labor Day, work is calling.
Subscribe to:
Posts (Atom)